Project 133

Complex site located in south London with part reconfiguration and extension of existing residential building to include the construction of two additional storeys, plus the construction of a new build four storey adjoining block.

Critical engineering considerations include limiting loads added to the original building and the presence of the trunk sewer below the new build block, requiring a piled cantilevered foundation solution and Thames Water build-over agreement.